BUILDING THE FUTURE TOGETHER

Campaign Budget
$4.5M Goal

A permanent investment in our community. A lasting legacy of compassion and care. Land is already secured  and located right around the corner from our current building. Pre-design planning has begun and leadership is in place.

new location

31 Morgan Street, the future home of The Bread of Life.

Projected Costs

The following reflects each category’s share of the projected $4.5M budget for the new Bread of Life Community Kitchen. Percentages are based on current cost estimates and are subject to refinement as architectural and engineering planning progresses. The land has been secured at no cost.

 

Construction ~55.6%

  • Core building construction including structural, mechanical, electrical, plumbing, roofing, exterior and interior finishes for the new facility.

Sitework & Miscellaneous ~ 24.4%

  • Site preparation, grading, utilities, parking, landscaping, and miscellaneous project costs not captured in direct construction.

Kitchen Equipment~ 6.7%

  • Commercial-grade cooking, refrigeration, food storage, and distribution equipment designed to support expanded meal service capacity.

Furniture & Fixtures~ 4.4%

  • Dining tables, seating, shelving, casework, and fixtures throughout the facility.

Construction Contingency (8%)~ 4.4%*

  • Reserve fund to address unforeseen conditions during construction, consistent with industry best practice for projects of this scale.

Architecture & Engineering ~ 2.2%

  • Professional design, engineering, and construction administration services from schematic design through project completion.

    Technology, IT & Security ~ 1.1%

    • Network infrastructure, computers, point-of-service systems, security cameras, access control, and communications equipment.

    Soft Cost Contingency (7%) ~ 1.1%*

    • Reserve fund applied to soft costs to cover unexpected professional fees, permitting delays, or other non-construction cost overruns.

    * Construction Contingency of 8% is calculated as a percentage of the $2,500,000 construction cost, not the project total.

    ** Soft Cost Contingency of 7% is calculated as a percentage of the $800,000 in total soft costs, not the project total. Its share of the overall project budget is 1.1%.